﻿{"code":200,"keyword":"索赔","total":60,"groups":{"questions":[{"type":"question","id":6512,"title":"【2025】施工投标报价时，采用不平衡报价策略的正确做法有（ ）。","q_type":"multiple","subject":"一造管理","chapter":"工程建设全过程造价管理","section":"","kp":""},{"type":"question","id":8508,"title":"根据《工程造价咨询企业管理办法》,不属于工程造价咨询业务范围的工作有（ ）。","q_type":"单选题","subject":"一造管理","chapter":"工程建设全过程造价管理","section":"","kp":""},{"type":"question","id":8883,"title":"在工程索赔过程中，工期索赔是指由于（　）的原因导致施工进度拖延，而要求批准延长合同工期的索赔。","q_type":"单选题","subject":"一造管理","chapter":"工程建设全过程造价管理","section":"","kp":"发承包阶段造价管理"},{"type":"question","id":8884,"title":"在工程索赔中，下列索赔属于按照索赔事件性质划分的是（　）。","q_type":"单选题","subject":"一造管理","chapter":"工程建设全过程造价管理","section":"","kp":""},{"type":"question","id":8993,"title":"7％、15％。该企业的加权平均资金成本为（）。","q_type":"单选题","subject":"一造管理","chapter":"5","section":"","kp":""},{"type":"question","id":6535,"title":"【2024】EPC 相比较普通DBB 模式优点（ ）。","q_type":"multiple","subject":"一造管理","chapter":"工程项目管理","section":"","kp":""},{"type":"question","id":6647,"title":"【2023】根据《标准施工招标文件》，由于发包人提供的工程设备不符合合同要求导致承包人费用增 加、工期延误的，发包人给承包人的补偿是（ ）。","q_type":"single","subject":"一造管理","chapter":"工程项目管理","section":"","kp":""},{"type":"question","id":6656,"title":"【2022】下列造价管理做法中体现全寿命期造价管理思想的是（ ）。","q_type":"single","subject":"一造管理","chapter":"工程经济","section":"","kp":""}],"flashcards":[{"type":"flashcard","id":781,"title":"长20％，钢材价格增长15％，试问承包商可索赔价款多少?","category":"concept","subject":"一造管理","chapter":"工程建设全过程造价管理","kp":"","mnemonic":""},{"type":"flashcard","id":793,"title":"其中，水泥价格增长20％，钢材价格增长15％，试问承包商可索赔价款多少?","category":"concept","subject":"一造管理","chapter":"工程建设全过程造价管理","kp":"","mnemonic":""},{"type":"flashcard","id":817,"title":"业务承接【了解】","category":"concept","subject":"一造管理","chapter":"工程造价管理及其基本制度","kp":"","mnemonic":""},{"type":"flashcard","id":849,"title":"天、480 元/辆天，针对以上事件发包人补偿费为多少万元，索赔的工期多少个月?t","category":"concept","subject":"一造管理","chapter":"工程建设全过程造价管理","kp":"","mnemonic":""},{"type":"flashcard","id":887,"title":"各主体工程竣工结算审查的主要内容","category":"concept","subject":"一造管理","chapter":"工程建设全过程造价管理","kp":"","mnemonic":""},{"type":"flashcard","id":890,"title":"辆天、480 元/辆天，针对以上事件发包人补偿费为多少万元，索赔的工期多少个月?t","category":"concept","subject":"一造管理","chapter":"工程建设全过程造价管理","kp":"","mnemonic":""}],"mnemonics":[{"type":"mnemonic","id":"312","subject":"一造管理","node_code":"5.2.2","node_path":"5/2/2","page_no":null,"title":"新建运营移BOT，成本高无建风险。 存量经营移TOT，ABS债券分散险。 PFI私融公服务，模式对比记心间。","snippet":"【口诀】新建运营移BOT，成本高无建风险。 存量经营移TOT，ABS债券分散险。 PFI私融公服务，模式对比记心间。 【正面】BOT、TOT、ABS、PFI 模式对比如何区分？ 【知识点】项目融资的主要方式","score":-2.8538,"semantic":true},{"type":"mnemonic","id":"307","subject":"一造管理","node_code":"2.2.2","node_path":"2/2/2","page_no":null,"title":"无章无签不中标，联合缺约不符标。 低价高限响应少，串通弄虚法禁止。","snippet":"【口诀】无章无签不中标，联合缺约不符标。 低价高限响应少，串通弄虚法禁止。 【正面】否决投标 7 种法定情形是什么？ 【知识点】招标投标法","score":-3.4085,"semantic":true},{"type":"mnemonic","id":"294","subject":"一造管理","node_code":"6.5.1","node_path":"6/5/1","page_no":null,"title":"14 天","snippet":"【口诀】14 天 【正面】质量保证金返还是什么？ 【知识点】缺陷责任期","score":-3.5995,"semantic":true},{"type":"mnemonic","id":"339","subject":"一造水利案例","node_code":"2.2","node_path":"2/2","page_no":null,"title":"利润收入不含税，总成四费加利息。 税后净利减税得，EBIT加利得。 EBITDA添折摊，利润利息折摊齐。","snippet":"【口诀】利润收入不含税，总成四费加利息。 税后净利减税得，EBIT加利得。 EBITDA添折摊，利润利息折摊齐。 【正面】利润总额=收入(含税)-总成本费用(含税)-增值税及附加是什么？ 【知识点】增值税","score":-3.901,"semantic":true},{"type":"mnemonic","id":"754","subject":"一造管理","node_code":"6.4.3","node_path":"6/4/3","page_no":null,"title":"答辩 28 天，评审 28 天","snippet":"【口诀】答辩 28 天，评审 28 天 【正面】争议评审","score":-2.394,"semantic":true},{"type":"mnemonic","id":"234","subject":"一造管理","node_code":"5.2.2","node_path":"5/2/2","page_no":null,"title":"无追索全贷款，有限仅资产。","snippet":"【口诀】无追索全贷款，有限仅资产。 【正面】项目融资追索权区分如何区分？ 【知识点】项目融资","score":-3.7353,"semantic":true},{"type":"mnemonic","id":"233","subject":"一造管理","node_code":"5.2.1","node_path":"5/2/1","page_no":null,"title":"有限追索表外融，风险分担周期长（项目融资=有限追索、表外融资、风险分担、融资周期长）","snippet":"【口诀】有限追索表外融，风险分担周期长（项目融资=有限追索、表外融资、风险分担、融资周期长） 【正面】项目融资核心特点是什么？ 【知识点】项目融资的特点和程序","score":-4.195,"semantic":true},{"type":"mnemonic","id":"715","subject":"一造管理","node_code":"2.2.2","node_path":"2/2/2","page_no":null,"title":"可 1 可 3，无约 3 人；费用对半，84 天裁决；不服收裁决，28 天提异议；84 天不出裁决，期满 28 天可仲裁","snippet":"【口诀】可 1 可 3，无约 3 人；费用对半，84 天裁决；不服收裁决，28 天提异议；84 天不出裁决，期满 28 天可仲裁；逾期不提异议，裁决必须执行 【正面】DAAB争端裁决规则","score":-3.8155,"semantic":true}],"notes":[{"type":"note","id":138,"title":"刷题笔记·工程索赔产生的原因","subject":"一造管理","chapter":"工程建设全过程造价管理","kp":"工程索赔产生的原因","snippet":"84 天（EPC 总承包专用，管理 / 案例冷门考点）** 承包人提出索赔，发包人应在**84 天内作出答复**；逾期未答复，视为认可索赔。 > ⚠️…"},{"type":"note","id":152,"title":"刷题笔记·决策阶段造价管理","subject":"一造管理","chapter":"工程建设全过程造价管理","kp":"决策阶段造价管理","snippet":"签约合同价，签约暂定；合同价格，最终结算，含变更索赔"}],"materials":[{"type":"material","id":43,"title":"（已压缩）（已压缩）2026一建《经济》电子教材（可搜索）","chapter":"","subject":"一建经济"},{"type":"material","id":50,"title":"2024版《建设工程造价案例分析（水利工程）》教材","chapter":"","subject":"一造水利案例"}],"points":[{"type":"point","id":"SLAL_3.4","title":"工程变更与索赔","item":"","subject":"一造水利案例","chapter":"第3章","section":"工程变更与索赔"},{"type":"point","id":null,"title":"工程变更与索赔管理","item":"","subject":"一造管理","chapter":"第六章 工程建设全过程造价管理","section":"6.4 施工阶段造价管理"},{"type":"point","id":"319","subject":"一造管理","node_code":"","node_path":"","page_no":null,"title":"工程变更与索赔管理","snippet":"【知识框架】工程变更与索赔管理","score":-1.5491,"semantic":true}],"textbook":[{"type":"textbook","id":639,"subject":"一造水利案例","material_id":50,"page_no":7,"node_code":"","node_path":"","title":"无","snippet":"…······················ (217)  案例五工程变更与索赔处理（一）………………………………………………（222)"},{"type":"textbook","id":640,"subject":"一造水利案例","material_id":50,"page_no":8,"node_code":"","node_path":"","title":"无","snippet":"目录 • 3 •  案例六工程变更与索赔处理（二）………………………………………………（227) 案例七工程变更与索…"},{"type":"textbook","id":822,"subject":"一造水利案例","material_id":50,"page_no":190,"node_code":"4.8","node_path":"","title":"工程投标（三）","snippet":"…限短（1 年以内）。 固定价合同具有以下特点：①结算方式比较简单；②承包人的索赔机会较少；③由于承 包人承担了全部风险，报价中不可预见风险费用较高。承包人确…"},{"type":"textbook","id":849,"subject":"一造水利案例","material_id":50,"page_no":217,"node_code":"5.1","node_path":"","title":"合同类型与工程结算","snippet":"…【考试大纲］ 1. 合同价类型及适用条件。 2. 计量与支付。 3. 交史与索赔。 4. 合同价格调整0 5. 违约处理。 6. 合同争议的处理。 7. 投…"},{"type":"textbook","id":850,"subject":"一造水利案例","material_id":50,"page_no":218,"node_code":"5.1","node_path":"","title":"合同类型与工程结算","snippet":"…证金预留、返还及工程维修质量、费用等争议的处理程序； 缺陷责任期内出现缺陷的索赔方式；逾期返还保证金的违约金支付办法及违约责任等事项 进行约定。 保证金采用…"},{"type":"textbook","id":852,"subject":"一造水利案例","material_id":50,"page_no":220,"node_code":"5.2","node_path":"","title":"计量与工程价款结算","snippet":"…/m3 o 建安工程的增值税税率为9% ，施工过程除上述事件外无其他的变更、索赔和价 款调整事件。 表5-1 工程项目总价 序号 项目名称 金额／万元 备注…"},{"type":"textbook","id":857,"subject":"一造水利案例","material_id":50,"page_no":225,"node_code":"5.4","node_path":"","title":"工程预付款、进度款、完工结算（二）","snippet":"…程款 100 万元；第8 个月完成工程款20 万元。不考虑合同实施：中变更、索赔等事件。"},{"type":"textbook","id":862,"subject":"一造水利案例","material_id":50,"page_no":230,"node_code":"5.5","node_path":"","title":"工程变更与索赔处理（一）","snippet":"…价款、应预留的质量保证金 （若有）、应支付的完工付款金额。 案例五工程变更与索赔处理（一） 一、背景 某水利枢纽工程全部使用国有资金建设，工程共分为A 、B…"}],"mindmaps":[{"type":"mindmap","id":24,"title":"答案—第1章第2节 工程造价管理的组织和内容","subject":"一造管理","chapter":"第1章第2节 工程造价管理的组织和内容","node_code":"1.2","node_path":"1/2","snippet":"…式选择、最高投标限价或标底编制 - 施工阶段：工程计量与结算、工程变更控制、索赔管理 - 竣工验收阶段：结算与决算 ##### 全要素造价管理 - 实现工程…"},{"type":"mindmap","id":28,"title":"答案—第1章第4节 工程造价咨询管理制度","subject":"一造管理","chapter":"第1章第4节 工程造价咨询管理制度","node_code":"1.4","node_path":"1/4","snippet":"…投标报价的编制和审核）；合 - 同价款的签订与调整（包括工程变更、工程洽商和索赔费用的计算）与工程款支付，工程结算、竣工 - 结算和决算报告的编制与审核等；…"},{"type":"mindmap","id":70,"title":"答案—第6章第3节 发承包阶段造价管理","subject":"一造管理","chapter":"第6章第3节","node_code":"6.3","node_path":"6/3","snippet":"…  - 工程规模大、专业复杂、建设单位的管   - 总承包 成的窝工、返工、索赔风险 #### 理能力有限 #### 缺点：有可能工程报价相对较高   - …"},{"type":"mindmap","id":72,"title":"答案—第6章第4节 施工阶段造价管理","subject":"一造管理","chapter":"第6章第4节 施工阶段造价管理","node_code":"6.4","node_path":"6/4","snippet":"… 划分标准 内容 - 成本核算科目 直接成本、间接成本 #### 工程变更与索赔管理 - （一）工程变更管理 - 1.工程变更的范围和内容 - 根据九部委发…"},{"type":"mindmap","id":73,"title":"填空—第6章第4节 施工阶段造价管理","subject":"一造管理","chapter":"第6章第4节 施工阶段造价管理","node_code":"6.4","node_path":"6/4","snippet":"… 第4节 施工阶段造价管理 #### 施工成本管理流程 #### 工程变更与索赔管理 #### 费用偏差及其表示方法 #### 常用偏差分析方法"},{"type":"mindmap","id":291,"title":"答案—第4章第7节 工程投标（二）","subject":"一造水利案例","chapter":"第4章第7节 工程投标（二）","node_code":"4.7","node_path":"4/7","snippet":"…（1 年以内）。 - 固定价合同具有以下特点：①结算方式比较简单；②承包人的索赔机会较少；③由于承包人承担了全部风险，报价中不可预见风险费用较高。承包人确定…"},{"type":"mindmap","id":292,"title":"问题—第4章第7节 工程投标（二）","subject":"一造水利案例","chapter":"第4章第7节 工程投标（二）","node_code":"4.7","node_path":"4/7","snippet":"…（1 年以内）。 - 固定价合同具有以下特点：①结算方式比较简单；②承包人的索赔机会较少；③由于承包人承担了全部风险，报价中不可预见风险费用较高。承包人确定…"},{"type":"mindmap","id":309,"title":"答案—第4章第16节 工程招标法律责任及处理","subject":"一造水利案例","chapter":"第4章第16节 工程招标法律责任及处理","node_code":"4.16","node_path":"4/16","snippet":"…大纲］1. 合同价类型及适用条件。 - 2. 计量与支付。 - 3. 交史与索赔。 - 4. 合同价格调整05. 违约处理。 - 6. 合同争议的处理。 -…"}],"lectures":[],"wrong":[{"type":"wrong","id":546,"title":"18.下列可导致承包商索赔的原因中，属于业主方违约的是（ ）。","subject":"一造管理","chapter":"工程项目管理","section":"","kp":"决策阶段造价管理","q_type":"single","node_code":"3.2","node_path":"3/2","question_id":5142,"module":"wrong-book","snippet":""},{"type":"wrong","id":547,"title":"18.下列可导致承包商索赔的原因中，属于业主方违约的是（ ）。","subject":"一造管理","chapter":"工程项目管理","section":"","kp":"决策阶段造价管理","q_type":"single","node_code":"3.2","node_path":"3/2","question_id":5142,"module":"wrong-book","snippet":""},{"type":"wrong","id":549,"title":"18.下列可导致承包商索赔的原因中，属于业主方违约的是（ ）。","subject":"一造管理","chapter":"工程项目管理","section":"","kp":"决策阶段造价管理","q_type":"single","node_code":"3.2","node_path":"3/2","question_id":5142,"module":"wrong-book","snippet":""},{"type":"wrong","id":575,"title":"【2022】建设单位索赔的方式有（ ）。","subject":"一造管理","chapter":"工程建设全过程造价管理","section":"","kp":"发承包阶段造价管理","q_type":"multiple","node_code":"6.4.3","node_path":"6/4/3","question_id":6729,"module":"wrong-book","snippet":""},{"type":"wrong","id":770,"title":"根据《标准施工招标文件》，由施工承包单位提出的索赔按程序得到了处理，且施工单 位接受索赔处理结果的，建设单位应在做出索赔处理答复后（ ）天内完成赔付","subject":"一造管理","chapter":"工程建设全过程造价管理","section":"","kp":"工程索赔产生的原因","q_type":"single","node_code":"6.4.4","node_path":"6/4/4","question_id":6091,"module":"wrong-book","snippet":""},{"type":"wrong","id":774,"title":"根据《标准施工招标文件》，下列导致承包人工期延误和费用增加的事项中，承包人可 2 同时索赔工期、费用和利润的有（ ）","subject":"一造管理","chapter":"工程建设全过程造价管理","section":"","kp":"发承包阶段造价管理","q_type":"multiple","node_code":"6.3","node_path":"6/3","question_id":6230,"module":"wrong-book","snippet":""},{"type":"wrong","id":865,"title":"根据《建设工程施工合同（示范文本）》，关于承包人索赔的说法，正确的有（ ）。","subject":"一造管理","chapter":"工程建设全过程造价管理","section":"","kp":"发承包阶段造价管理","q_type":"多选题","node_code":"3.6","node_path":"3/6","question_id":8737,"module":"wrong-book","snippet":""}],"files":[{"type":"file","id":510,"title":"2024年一造（承包人的索赔事件及可补偿内容-调整顺序）.docx","subject":"","chapter":"其他","section":"","kp":"","q_type":"","node_code":"","node_path":"","question_id":null,"module":"file-library","snippet":""},{"type":"file","id":568,"title":"第05章第01讲　工程索赔、变更、签证.mp4","subject":"一造水利案例","chapter":"精讲讲义","section":"","kp":"视频","q_type":"","node_code":"","node_path":"","question_id":null,"module":"file-library","snippet":""},{"type":"file","id":639,"title":"WM_15索赔.pdf","subject":"一造水利案例","chapter":"其他","section":"","kp":"","q_type":"","node_code":"","node_path":"","question_id":null,"module":"file-library","snippet":""},{"type":"file","id":696,"title":"43.第5章：变更与索赔1.flv","subject":"一造水利案例","chapter":"精讲讲义","section":"","kp":"视频","q_type":"","node_code":"","node_path":"","question_id":null,"module":"file-library","snippet":""},{"type":"file","id":697,"title":"44.第5章：变更与索赔2.flv","subject":"一造水利案例","chapter":"精讲讲义","section":"","kp":"视频","q_type":"","node_code":"","node_path":"","question_id":null,"module":"file-library","snippet":""},{"type":"file","id":742,"title":"WM_43.第5章：变更与索赔1.pdf","subject":"一造水利案例","chapter":"精讲讲义","section":"","kp":"","q_type":"","node_code":"","node_path":"","question_id":null,"module":"file-library","snippet":""},{"type":"file","id":743,"title":"WM_44.第5章：变更与索赔2.pdf","subject":"一造水利案例","chapter":"精讲讲义","section":"","kp":"","q_type":"","node_code":"","node_path":"","question_id":null,"module":"file-library","snippet":""},{"type":"file","id":1166,"title":"第47讲-第5章变更与索赔1.mp4","subject":"一造水利案例","chapter":"精讲讲义","section":"","kp":"视频","q_type":"","node_code":"","node_path":"","question_id":null,"module":"file-library","snippet":""}]}}
__HTTP=200 TIME=36.905247 SIZE=19461